Commuters using the Central Railway suburban sections in Mumbai are advised to plan their travel accordingly as megablocks are set to be in operation on Sunday. These megablocks are essential for conducting various engineering and maintenance works to ensure the safety and efficiency of the rail network.
On the Main line, the megablock is scheduled between Chhatrapati Shivaji Maharaj Terminus and Vidyavihar on Up and Down slow lines. The block will be in effect from 10:55 am to 3:55 pm, impacting travel on this route.
Meanwhile, on the Harbour line, the rail block will occur on the Chhatrapati Shivaji Maharaj Terminus – Chunabhatti / Bandra Down line from 11:40 am to 4:40 pm. Additionally, the block will affect the Chunabhatti / Bandra – Chhatrapati Shivaji Maharaj Terminus Up line from 11:10 am to 4:10 pm.
To minimize inconvenience for passengers, special services will operate between Panvel and Kurla (Platform No. 8) during the block period. Harbour line passengers are advised that they will be allowed to travel via the Main Line and Western Railway between 10 am and 6 pm on Sunday during the block period.
Commuters are urged to check the revised schedules, plan alternative routes, and consider the special services provided during the megablock period to ensure a smooth and efficient commute on the Central Railway suburban sections.