The platform of the new Aerocity-Tughlakabad Silver Line corridor of phase 4, construction work for which has already started, will be the longest among all phase 4 stations with a length of 289 metres, a statement said on Sunday.
According to the Delhi Metro Rail Corporation (DMRC), the general length of underground metro stations in phase 4 is about 225 metres, but this new station will be the longest among all phase 4 stations with a length of 289 metres.
“Its extensive length has been carefully designed to accommodate the anticipated passenger traffic since, in the future, this station will be a key triple interchange facility with connectivity among the Airport Express Line, the Silver Line, and the RRTS corridor to Gurugram, Manesar, and Alwar,” the DMRC said in the statement.
BJP formed a third successive government under the leadership of Prime Minister Narendra Modi. Since…
The announcement of a ceasefire deal in conflict between Hamas and Israel This agreement marks…
Pope Francis injured his arm after suffering his second fall within a month. The incident…
Jair Bolsonaro’s passport remains seized as he faces coup-related charges. His attempt to attend Trump’s…
A group of Russian diplomats infiltrated a private section of UK Parliament during a tour,…
World Chess Champion Gukesh thanked the nation after being conferred with the Khel Ratna award,…